Renewable Energy

Dovera

Dovera | Italy

5.86

MWp

Installed capacity

6.27

GWh

Annual energy production

2.405

t/year

CO₂ emissions avoided

Aim of the work:

Engineering, Procurement and Construction

Start:

10 / 2022

End:

09 / 2023

The building is LEED
certified Platinum.