Renewable Energy

Calvenzano

Calvenzano | Italy

2.91

MWp

Installed capacity

3.40

GWh

Annual energy production

1.304

t/year

CO2 emissions avoided

Aim of the work:

Engineering, Procurement and Construction

Start:

03 / 2022

End:

03 / 2023

The building is BREEAM
certified Very Good.